Project Details

client

SECOMSA & Consell Comarcal del Baix Camp

Year

2026

Project Definition

  • Construction of a new prefabricated concrete warehouse of 1,630 m2 with a height of 12 meters.
  • Structural civil works consisting of foundations, retaining walls, and associated underground networks.
  • Cladding and roofs made of sheet metal.
  • Execution of all facilities: lighting, ventilation, fire protection system (FPS), drainage, leachates, and affected plant services.
  • Construction and assembly of various metal pipe racks, using 100 tons of laminated steel, to support conveyor belts connecting different processes located inside the plant.
  • Construction of a new prefabricated warehouse of 1,000 m2 and construction of 4 aerated slabs inside, known as trenches, where the green waste fraction is treated. It includes aeration, electricity, lighting, and leachate network facilities, all connected to the existing general plant services.
  • Expansion of the treatment capacity by building a new bio-drying area consisting of 8 new silos and extending the electrical power, ventilation, lighting, and leachate pumping facilities.